Otto-Warburg-House (D80)

The building:

  • Three-storey biotech laboratory buildings with 2.800 m2 effective area
  • Constructed in 2001
  • lab-office combinations of various sizes
  • Social and sanitary rooms, sculleries and central changing/locker rooms
  • Elevator

The labs:

  • S1 and S2 standard labs/one separate S3 lab
  • Laboratory furniture with lab work table, sink, countertop fume extractor, utility turret, power strip, window workplace
  • Central supply with cooling water and demineralised water
  • Decentralised ultra-pure gas delivery (choice of 2 gases per commercial unit from the safety cabinets, 2 outlets/ laboratory)
  • Communications access technology via high speed data network (also in offices)
  • Storage rooms for chemicals including hazardous substance center for the supply and disposal of chemicals
  • Ceiling payload 5.0 kN/m2
  • Excellent price-performance ratio

Grundriss


Otto-Warburg-House

Otto-Warburg-House (D80)

Otto-Warburg-House